Flood Protection
This year, the Flood Maintenance Department focused on securing programmatic permits from state and federal agencies to streamline routine maintenance, while also addressing sediment removal and ensuring regulatory compliance. The Flood Protection Engineering team successfully completed designs to repair extensive bank damage in Dublin and Pleasanton caused by the 2023 major storm events, including a bank stabilization project on Alamo Creek.
Small Fixes Now Prevent Costly Damages Later
Every repair effort:
- Protects groundwater quality
- Keeps the Tri-Valley safe
- Improves our recovery efforts and resiliency
By acting this year, Zone 7 reduced next year’s challenges.
Proactive Flood Maintenance
![]()
Inspections were conducted to evaluate the flood protection system and identify locations with inadequate flow capacity, required maintenance, or other deficiencies. Areas requiring improvements and maintenance have been addressed or documented, and potential corrective measures have been identified. Proactive resolution of these issues is essential to protect property, enhance public safety, and preserve the health of waterways and ecosystems throughout the Tri-Valley region.
tons of trash and debris removed from channels
linear feet of vegetation cleared
acres of flood control facilities grazed by goats
sandbags deployed
Debris Removal Protects Water Quality

Due to their urban location, flood facilities in Livermore, Pleasanton, and Dublin, are susceptible to hazardous debris, posing a threat to water quality and watershed health, making removal a key priority. Zone 7 addresses this through a multi-faceted approach:
- Agency staff and contractors conduct trash and debris removal, ensuring proper disposal of hazardous materials.
- Coordination with social service providers and law enforcement on issues related to the Tri-Valley's unhoused population.
- Collaboration with Living Arroyos and other local groups for volunteer-based cleanup efforts.

Vegetation Management Clears Water Flow and Reduces Fire Risks
![]()
The Flood Maintenance team cleared nearly 66,000 linear feet of overgrown vegetation. This management is crucial for ensuring efficient water flow by preventing obstructions and debris accumulation, thereby reducing flood risks and enhancing fire safety throughout the Tri-Valley region.

We’ve got a goat thing going!
![]()
The Zone 7 goats returned for their fifth season as a key part of the integrated vegetation management plan. They naturally clear overgrown channel and trail vegetation to create a critical fire break, maintaining flood channels without pesticides or soil disturbance.
The goats hungrily chew away overgrowth of:
Trees
Bushes
Grasses
Weeds
Shrubs
Ragweed
Poison Oak
Thistles
Thorny Vines
Blackberry
These goats are part of our integrated vegetation management plan with diverse methods of controlling growth alongside flood protection channels, which may double as recreational trails through local partnerships. While these trails provide community benefits, they also pose a high risk for fire, making vegetation management critical – and why we appreciate our goat helpers so much!
Flood Management Plan
![]()
New StreamTracker Web Portal
![]()
Storm Alert System
![]()
Flood Protection Capital Project Updates
![]()
2023 Storm Repairs
In early 2023, intense storms severely damaged Zone 7’s flood protection facilities. Following those storm events, Engineering and Maintenance staff systematically assessed the damage, prioritized repairs, and submitted requests for federal disaster aid. This crucial groundwork – including damage assessment, repair prioritization, and securing necessary funding – provides a strong foundation for the streamlined scheduling and implementation of prioritized construction repairs to ensure the long-term resilience of our flood protection system.
miles of flood channels assessed for damage
construction management contract award to manage flood projects in 2026
sites approved for USACE grant funding
flood channel repair designs completed
construction contract awards for construction in 2026
$28,165,000
sites approved for USACE grant funding
flood channel repair designs completed
construction contract awards for construction in 2026
$28,165,000
in total USACE grant assistance
Alamo Creek Bank Stabilization Pilot Project: A Grant-Funded Investment in Tri-Valley Flood Protection
![]()
The pilot project design utilizes rock vane structures to redirect turbulent flows away from the bank and features embedded rock to prevent scour, significantly increasing bank stability. Plantings at the toe of the bank further reduce high-velocity flows to prevent erosion. This project is a key example of a multi-benefit solution: in addition to reducing flood risks, it enhances the creek’s aesthetic qualities by incorporating native vegetation for shade and improved visual appeal, while also supporting water quality and fish and wildlife habitats.