Achievements in

Water System Operations and Maintenance

The Operations and Maintenance teams are committed to ensuring continuous, safe, efficient and reliable water supply to our customers. Zone 7’s treatment plant and distribution operators are certified through the Department of Drinking Water and receive regular training and certification updates. Working around the clock, the operators continually monitor and adjust facility operation to match customer demands, manage the groundwater basin and respond to changing conditions. This is accomplished through a network of instruments and facility operations that can be remotely controlled to ensure continuous compliance and readiness.

Patterson Pass Water Treatment Plant

2

PFAS treatment plants

9

groundwater production wells

2

surface water treatment plants

operated 24/7/365

Stoneridge PFAS

1

groundwater demineralization plant
Mocho Demin

12

billion gallons

of treated water delivered to customers

Maintaining Infrastructure for the Tri-Valley Community

 

The Zone 7 maintenance team continually inspects and maintains facilities to extend their useful life, ensure they meet the agency’s goals for reliability, and plans for right-time upgrades and renewal and replacement. This year, Zone 7 continued its commitment to best-available technology and cost-efficiency through replacement of the Computerized Maintenance Management System (CMMS) in order to increase proactive maintenance, asset and resource tracking, standardization of methods and tools and more.

40 miles

of water transmission pipelines

4

pump stations

5

treated water storage reservoirs

12

backup generators and a large fleet of vehicles maintained