Achievements in

Water Reliability

acre-feet of potable water was delivered to Tri-Valley homes and businesses via direct users and four retailers

acre-feet of untreated water supplied to customers in the Tri-Valley

acre-feet added to the local groundwater basin through artificial recharge

Treated Water Production for FY25

–

Non-drought year compared to drought year

Treated Water Production for FY22

(during the peak of the drought)

Sustainable Groundwater Management

The Sustainable Groundwater Management Act (SGMA) was enacted in 2014 to address the overuse of California’s groundwater, which is critical during droughts. Zone 7 has proactively managed the local groundwater basin since the 1960s, demonstrated by the 2019 acceptance of its Alternative Groundwater Sustainability Plan (AGSP), one of only nine approved statewide. The agency manages the basin sustainably by replenishing and storing water during wet years, using it as a crucial “bank” to supply the Tri-Valley during dry periods, such as the 2022 drought. The next AGSP Update is due by December 21, 2026.

Refilling our local water savings account

After the 2022 drought lowered the basin to 70% capacity, high volumes of rain and water from the South Bay Aqueduct allowed Zone 7 to recharge the basin to nearly 100%. The basin has been maintained at full capacity for the past two years.

Keeping our groundwater safe from PFAS

Per- and Polyfluoroalkyl substances (PFAS) are synthetic chemicals found globally in air, soil, and water, including in the local groundwater basin. Zone 7 has completed various PFAS management strategies to ensure the water remains safe.
  • PFAS Potential Source Investigation (Jacobs Engineering, Inc. 2020)
  • PFAS Mobilization Modeling Study (2022) to analyze movement of known PFAS plumes when pumping conditions change
  • Coordinated with the San Francisco Regional Water Quality Control Board to support their mission to identify sources and responsible parties for PFAS cleanup
  • Expanded the PFAS groundwater monitoring program in 2025 to continue to track the extent of PFAS in the groundwater basin

Water Reliability Capital Project Updates

Securing our Water Future

Exploring a Chain of Lakes Conveyance System

Zone 7 is evaluating a Chain of Lakes Conveyance System as a local water storage project. This project would include a pipeline, pump stations and turnouts that would be used to connect the South Bay Aqueduct, former gravel mining pits and the Del Valle Water Treatment Plant. This project would enable Zone 7 to store wet-year water, both from the State Water Project and local runoff, for use in dry years.

  • Key Planning Efforts
  • Completed Alignment Feasibility Study
  • Feasibility Study underway
  • Internal Brainstorming sessions

Sites Reservoir Project Progress

Zone 7 continued investment in the Sites Reservoir Project, a proposed 1.5 million acre-foot offstream reservoir that would supply both additional water supply and alternative storage for Zone 7.

  • Helps adapt to California's changing climate
  • Offers a rain-fed storage solution that will capture excess rainfall
  • Provides a new off-stream reservoir to store water for use during dry periods
  • Capitalizes on the increasing frequency of intense storms
  • Addresses the need for a more flexible water supply

2024

Sites Authority Board approved the project

2026

Construction of Sites Reservoir is expected to begin

2033

Full operations of Sites Reservoir is expected to begin

Take a Virtual Tour of Sites Reservoir

7
  • Project highlights
  • The Sites Authority was awarded an inflationary boost of $218.9 million to its Proposition 1 funding.
  • The Sites Authority was allocated an additional $134 million in funding from the Water Infrastructure Improvements for the Nation Act.
  • The U.S. Fish and Wildlife Service issued a biological opinion for construction of Sites Reservoir, a key permit needed to advance the project.

Delta Conveyance Project

Zone 7 continued to invest in the Delta Conveyance Project (DCP), a proposed tunnel that would provide Zone 7 with dual conveyance across the Delta and help increase the reliability of State Water Project (SWP) supplies.

7
  • Project highlights
  • Creates an underground tunnel connecting new intake facilities in the North Delta (with fish screens) to existing South Delta facilities.
  • Protects SWP water supply reliability by minimizing disruption from seismic risk and addressing the anticipated impacts of sea level rise and climate change.
  • Provides operational flexibility to improve aquatic conditions in the Delta while ensuring reliable water diversion.
  • Key planning effort progress:
  • ZThe Zone 7 Board authorized up to $6.6 million for Zone 7’s share of the planning and preconstruction costs for Calendar Years 2026 to 2027.
  • ZIn February 2025, the State Water Resources Control Board began the Change in Point of Diversion proceedings for the California Department of Water Resources' water rights. This key permitting effort is expected to continue into Fiscal Year 2027.
  • ZThe California Department of Fish and Wildlife issued an Incidental Take Permit for the DCP which will cover construction and initial operations.
  • ZIt is estimated that if the DCP was operational during the 2025 Water Year, an additional 956,000 acre-feet of water could have been captured.

Water conservation as a way of life

Zone 7 continued to promote water conservation as a permanent way of life for the Tri-Valley community. With the growing unpredictability of climate extremes, including intense storms and prolonged dry periods, maintaining a reliable water supply and robust reserves—such as our local groundwater basin—remains essential for the region’s long-term sustainability.

gallons of potable water saved in FY25 relative to FY21

%

reduction in potable water usage during the same period

Rebates help reach our conservation goals

Zone 7 continued to promote its High Efficiency Clothes Washer, Lawn Conversion, Pool Cover, and Smart Irrigation Controller rebates in partnership with our retailers:

high-efficiency clothes washer rebates

water-efficient lawn conversion rebates

smart irrigation controller rebates

pool cover rebates

During the 2024-25 fiscal year, the Water Conservation Team worked to refresh the Conservation Zone rebates program with higher rates and a new campaign. Take a peek at some of our newest rebate videos below.

Conservation Events

​​In conjunction with the local water retailers, Zone 7 hosted several water conservation events for the community to provide the public with water-saving tools and knowledge.

  • 1 Lawn Conversion Party to install water-wise garden
  • 2 Hands-on Water Conservation Workshops

Get notified about our events, receive water-saving tips and stay up to-date on rebate offers!

Historical Flood & Drought Cycle

Almost 25 years of rainfall history show us the alternating nature of drought and flood periods. This helps highlight the importance of long-term water storage planning.
Historical Drought Cycle - Infographic